Karratha: Western Australia
In 2018 and the beginning of 2019, DGI had a small crew working for BGC Contracting at the Karratha Gas Plant undertaking the installation of below ground GRE piping to the above ground connections using adhesive joints, potable water, service water, denim water return, reject water and hydrotesting.
Project Background
The Karratha Gas Plant produces LNG, domestic gas, condensate and LPG and has an export capacity of 16.9 Mtpa, with five LNG processing trains; two domestic gas trains; six condensate stabilisation units and three LPG fractionation units.