Derek Gee Installations Pty Ltd worked on its biggest project to date, the $54 billion Gorgon LNG Project on Barrow Island, Western Australia from March 2013 until June 2017, working with Clients; Leighton Contractors / CPB Contractors, Thiess, CKJV (CB&I Kentz JV), CB&I Tanks and Sarplast.
Employing up to 150 people on site, DGI have been involved with pipe pre-spooling and installation of both Sarplast and NOV-FGS (Ameron) GRVE/GRE piping. Upon completion of the GRVE scope DGI were awarded the internal fit out of over 1,200 Firewater Valve pits and Class 1 & 2 Manholes and Valve pits, which included Valve Installation and internal furniture fit out.
In addition to this, DGI were involved in electrical cable pulling, hydro testing, crane co-ordination, flange management and supply of operators, trade assistants and mechanical fitters. DGI also supplied fully accredited D5 GRE/GRVE Pipe Fitter Bonder Supervisors and D6 GRE/GRVE Pipe Fitter Bonder Inspectors (ISO 14692-4) to various clients.
During this period, DGI was also working on the Northern Territory’s largest construction project, the $34 billion Ichthys Onshore LNG Facilities, Bladin Point.
DGI was involved in the project from October 2013 until June 2017, working with Clients; Leighton Contractors / CPB Contractors (on and off site), CH2-UGL Joint Venture (on and off site), JKC, and Laing O’Rourke with pre-spooling and pipe installation, carbon steel vent piping, grouting on pit penetrations, and hydro testing as well as suppling fully accredited D5 GRE/GRVE Pipe Fitter Bonder Supervisors and D6 GRE/GRVE Pipe Fitter Bonder Inspectors (ISO 14692-4).
Karratha: Western Australia
In 2018 and the beginning of 2019, DGI had a small crew working for BGC Contracting at the Karratha Gas Plant undertaking...
View detailsPerth: Western Australia
DGI has had a crew at the Woodman Point Wastewater Treatment Plant in Woodman Point, Western Australia during 2018 and 2019...
View detailsKarratha: Western Australia
DGI have been working on the Yara Pilbara Nitrates site during 2018 and 2019 for some critical shutdown work of spool modification...
View detailsWerribee: VIC
Derek Gee Installations Pty Ltd have been working with a small crew on the Western Treatment Plant in Werribee, Victoria...
View detailsPort Pirie: SA
DGI have had a small crew at the Nyrstar Port Pirie Redevelopment from June, 2017 working with Goodline to reinforce the...
View detailsBarrow Island: WA
Derek Gee Installations Pty Ltd worked on the Gorgon LNG Project on Barrow Island, Western Australia from March 2013 until...
View detailsDarwin: NT
Derek Gee Installations Pty Ltd worked on the Ichthys Onshore LNG Facilities Project in Darwin, Northern Territory from...
View detailsPerth: WA
Derek Gee installations installed over 17 kms of GRP pipework onsite at the Binningup stage 2 Desalination plant in...
View detailsPort Stanvac: SA
Derek Gee Installations tendered on, and were successful in winning the onsite fibreglass Installation package for the...
View detailsNew Caledonia: Sth Pacific
Derek Gee Installations Pty Ltd were contracted on the Goro Nickel Project on the South Pacific Island of New Caledonia...
View detailsWonthaggi: VIC
From September, 2009 until late 2012, Derek Gee Installations Pty Ltd had up to 40 employees on the Victoria...
View detailsAlbany: WA
DGI supplied and installed odour duct for Guidera O'Connor on the Albany Waste Water Treatment Plant in March, 2018.